HOW TO SHIP YOUR NUCLEAR DENSITY GAUGE INTO QAL-TEK

Making it Easy for You

We make shipping your gauge to us for servicing as easy and cost-efficient as possible.  Once set into action, we take care of most of the details so you can concentrate on everything else.

STEP 1

Download the Nuclear Density Gauge Service Order Form, fill it out, and return it to us by email (preferred) or fax.

STEP 2

We make all the arrangements with the shipper and set up the pickup for you.  You are then emailed with:

  • the Bill of Lading (BOL)
  • confirmation of the pickup date
  • reminders based on the steps outlined below

STEP 3

Print out 3 copies of the attached BOL

Take 1 copy and adhere it to the TOP of the gauge box with clear packing tape.  Please cover the entire area of the BOL to prevent any damage to the BOL during shipping.

Take the other 2 copies and sign the bottom-left-hand-side where it states ‘shipper’

The driver will then sign both copies as well.

The driver will take one copy and you will keep the other.  Please keep this BOL in the permanent records of this particular serial number’s file.

STEP 4

All we need is the gauge and the standard block.  Please take any extra field tools out of the gauge box to eliminate any extra shipping weight.

The source handle has to be padlocked per DOT regulations. The two outside locks CANNOT be padlocked.  Please secure the two outside clasps with heavy duty zip ties.

Please make sure all the proper shipping stickers/labels are on the box and legible.  If you need new stickers and labels we have them available for sale and can ship them to you right away.

For help. please call

208-523-5557